Preloader image

Archive

Gibbs Cancer Center

SRHS Gibbs Cancer Center

Seven-story, 208,094 sf new facility with a variety of patient-centric features, including an oncology pharmacy, a chapel, centralized labs and an entire floor dedicated to patients and families. Other features include an infusion center with 40 chairs, a phase 1 study unit with room for 8 patients at one time, and a holistic care floor.

Mission Health - McDowell Replacement Hospital

McDowell Replacement Hospital

The McDowell Hospital project included a new three-story, 115,000 sf acute care replacement hospital built parallel and only 25 ft from the existing 95,000 sf operational hospital facility. The new facility includes (4) operating rooms, (1) endoscopy room, (14) PACU bays, (5) labor/delivery rooms, (20) medical-surgical beds, (6) critical care rooms, (2) isolation rooms, (14) bed Emergency Department, MRI, CT Scanner, RAD, infusion suite, obstetrics/ gynecology clinic, cardiology clinic, sleep lab and a full-service kitchen/cafeteria.



Booking.com Renovation

Booking.com

Booking.com was a 4,800 sf upfit in the Charlotte Plaza building located at 201 S College St., Charlotte, NC.  Included in the scope of work was demolition, new wall partitions, Dhive Glazing system at focus and conference rooms, all new mechanical equipment, relocation of plumbing for a break room, and multiple core drills for powered work stations. Construction took place during normal business hours requiring close coordination with surrounding tenants and building’s engineering team.

Davidson Community College

Davidson County Community College – Health Sciences Center

Vannoy Construction provided preconstruction services and served as Construction Manager at Risk for the new Health Sciences Center at Davidson County Community College. The project consisted of a 2-story, 48,358 sf building with partial walk-out basement on the existing occupied campus; which houses the college’s nursing, pharmacy technology, medical lab technology, emergency medical science, massage therapy, and esthetic’s programs. The building was a steel-framed structure supported on spread footings, and the building envelope included brick, storefront windows, metal wall panels, TPO roofing, and standing seam metal roofing. The project also required a 25-foot high soil nail shoring system to facilitate remediation of approximately 10,000 cubic yards of unsuitable soils within the footprint of the future building. Vannoy Construction’s expertise in grading and site development work was instrumental in identifying and executing the most cost-effective strategy for completing the shoring and unsuitable soils work prior to construction.


Virtual Tour