Preloader image

Archive

Wilkes Community College - Ash Campus Classroom and Lab Buildings

Wilkes Community College – Ashe Campus Classroom & Lab

This CM at Risk project included the construction of two buildings consisting of 36,366 sf. The Classroom & Lab (28,088 sf) and Cosmetology Building (8,278 sf) include general classrooms, health science labs, a cosmetology lab, faculty offices and administrative/student support areas.

READ MORE
VT NUQRH

Virginia Tech – New Upper Quad Residence Hall

This project’s site is at the southeast corner of Stanger Street and Old Turner Street where an existing facility, Femoyer Hall, is currently located. Femoyer Hall is an approximately 35,000 sf facility constructed in 1949 and originally designed as a residence hall; it will be demolished as part of this project. Given the constraints of the existing site, the building footprint and orientation of NUQRH will be two wings, the North wing running East to West, and the West Wing running North to South. The project shall provide a strategy for the site and landscape design that allows for fire

READ MORE
Wiley Middle School

Wiley Middle School Renovations

Scope of work included demolishing the existing gymnasium and constructing a new 24,301 sf, two-story addition with administrative space, gymnasium, entrance lobby, restrooms and storage on the top level, and four (4) new classrooms, lockers and more storage in the lower level. The existing gymnasium housed the boiler that serves the entire school campus. A new boiler was installed in an existing mechanical room in the main school building, requiring a new cast in place concrete elevated slab, new 2-hour rated enclosure, and new exterior entrance. Also included in the scope was the renovation of 2,881 sf of administrative office

READ MORE
Virginia Tech - Corps Leadership and Military

Virginia Tech – Corps Leadership and Military Science Building

Demolition of the existing Arts, Learning & Design Center and the construction of a new 65,428 sf, 3-story, steel framed structure supported on deep foundation micropiles, constructed to span over an existing 8,449 sf fully functioning Water Treatment Plant. The new building will provide offices, conference rooms, meeting rooms, and classrooms for the Corps of Cadets. It will also house a museum for the Corps, along with a 3 story atrium and an executive honor court. Exterior skin consists of architectural precast concrete, Hokie stone and aluminum punched windows. The project also involves extensive sitework, including the relocation of existing

READ MORE