Lowes of Holly Springs Sitework

This 38-acre site included all grading for a new 103,000 sf Lowe’s Superstore as well as a future Wegman’s Grocery store. The project also included widening Wildwood Drive and Ralph Stephens Road, as NC 55 was being widened to include a 16” waterline relocation, gas line relocations, and new traffic signals at the intersection of NC 55 and Ralph Stephens Road.

Hendrick Jaguar/Land Rover Sitework

Hendrick Automotive Group, Jaguar/Land Rover Sitework

This 18-acre phased project included grading for a new Jaguar/Land Rover dealership, as well as the re-construction of six (6) acres of existing parking used to store commercial vehicles. The project included 150,000 CY of earth haul off, retaining walls, storm drainage water & sewer improvements, relocation of an existing ATT switching cabinet, pervious pavers, curb & gutter, and asphalt pavement.

Town of Sparta Streetscape

Town of Sparta Streetscape

This USDA-funded project involved the replacement of the water main and water services through the Town of Sparta along US 21 from Grandview Drive to Trojan Avenue with milling and replacement of the existing asphalt surface course over the waterline. The project also included the complete removal of all existing pavement and sidewalks from Doughton Street to Cheek Street, as well as the intersection of US 21 and NC 18. Following the removal of the old asphalt, the profile of the roadway was adjusted to allow for a better tie-in of new curb and gutter, concrete sidewalks, brick paver sidewalks, and removal and replacement of the existing traffic signal with a new architectural mast arm traffic and crosswalk signal system.

Jaguar/Land Rover Charlotte, NC

Hendrick Charlotte Jaguar-Land Rover

New, ground-up construction of a 42,000 sf Jaguar/Land Rover (JLR) dealership. This is a brand new prototype image for JLR and is the first one constructed by Hendrick Automotive. The building scope of work consisted of a new showroom, customer lounge, service drive, and full-service department. Along with the JLR dealership, a parking lot expansion was constructed to help handle the inventory from other adjacent dealerships. Despite the Covid pandemic, the project turned over on time and within budget.