Preloader image

Archive

VanTrust Park 290

VanTrust Park 290 – Building 7 & 8

The VanTrust Park 290 project consists of two (2) new tilt-wall industrial warehouses. Building 7 will include a 615,000 sf, cross-dock warehouse with a clear height of 40’, and 62 dock doors. Building 8 is planned as a 225,000 sf, rear-load facility with a clear height of 32’, and 22 dock doors. The construction of the two (2) buildings will begin in March 2022 with a scheduled completion of December 2022.

Garlington Road Industrial Park

Garlington Road Industrial Park

Design-Build construction of a core & shell industrial warehouse building totaling 140,000 sf.  The scope included 41’- tilt-wall construction with 32 dock bays and was designed as a multi-tenant building.

Tribal Foods

Eastern Band of Cherokee Indians – Tribal Food Distribution Center

Renovation to an existing 12,000 sf pre-engineered metal building to suit the expanding needs of the Tribal Food Distribution Center. The proposed scope will include demolition of approximately 4,000 sf of the existing building, and constructing a 2-story, steel-framed 12,000 sf addition. The new addition will include offices, a demonstration kitchen, drive-in cooler/ freezers, new entrances, and lobbies. The existing parking lots surrounding the building will be improved to meet requirements for parking and loading dock access. A new drive-thru lane and appropriate canopies for curbside delivery will also be included.

Jabil

Jabil Healthcare Injection Molding & Assembly Facility

Construction of a new 165,000 sf build-to-suit manufacturing plant, as well as 32 acres of site development. The building construction is exterior insulated pre-cast call panels with a 32’ clear height. Interior finishes include an 80,000 sf clean room, 20,000 sf of Class A office space, 25,000 sf of maintenance area, and 40,000 sf of warehouse & dock area.