Preloader image

Archive

Gibbs Cancer Center

SRHS Gibbs Cancer Center

A 7-story, 208,094-square-foot facility that integrates cancer treatment, research, education, and holistic support services under one roof. Key features include an oncology pharmacy, chapel, centralized labs, a dedicated patient and family floor, a holistic care level, a 40-bay infusion center, and a Phase 1 study unit accommodating up to eight patients. The center is physically connected to Pelham Medical Center via a newly constructed 453-foot pedestrian bridge. Its exterior combines precast panels, glass, steel, and brick for a modern, healing-focused design. The project developed approximately 19.4 acres, which included relocating the campus’s main street about 100 feet to accommodate the new building footprint. This roadway serves as the primary access route for all campus facilities and required careful planning and coordination to minimize disruption to EMS services, staff and visitor access, vendor deliveries, and overall hospital operations. A new perimeter road was also constructed to improve traffic flow around the campus.

 

Four major challenges that had to be overcome included:
– Relocation of Main Street and Campus Utilities
– Maintaining Campus Access Through Phased Construction
– Adverse Weather Conditions
– Unsuitable Soils and Subsurface Rock

Novant Health - Mint Hill-MOB

Novant – Mint Hill Medical Office Building

The 13,000 sf Mint Hill Medical Office Building is located on the Novant Health Mint Hill Medical Center Campus. The MOB is scheduled to open in 2016 and will house physician practices and other medical services. The project is part of the medical campus located at the intersection of I-485 and Albemarle Road on approximately 82 acres.

Sentara Edinburgh MOB

Edinburgh Medical Office Building

The Edinburgh Medical Office Building project is a 60,000 sf medical office building. The building facade is brick with cast stone and EIFS accents and a metal mansard roof. Interior programming for various medical offices and a fitness center. In order to reduce the overall project schedule, select scopes of work were released to allow critical path work to progress while design and permitting were being finalized. The medical office building is part of a larger campus in the southern portion of Chesapeake. Sentara’s goal is to make the campus a comprehensive destination for care.