Preloader image

Archive

Harrisburg MOB

Novant Health – Harrisburg MOB

The new Harrisburg Medical Office Building is a two-story, 24,000 sf Core & Shell building with the 2nd floor (12,000 sf) upfit into medical office space for Novant Health. The building was developed and is owned by Vannoy.

Franklin School of Innovation

Franklin School of Innovation

This project consisted of a new 43,600 sf, two-story state-of-the-art facility consisting of classroom, administration, gymnasium, common areas, and multipurpose room. The project was built adjacent to the existing school campus and inside the traffic loop. Safety, separation, and planning were very critical.


Photos by ARCA Design

Asheville High School Renovation

Asheville High School

The Asheville High School – Rehabilitation project consisted of a multi-faceted, multi-phase (three), multi-building (six) restoration and renovation of 165,000 sf of the Historic Asheville High School campus, while keeping it fully occupied and operational. The overall scope was to restore the shells of six buildings on the historic campus back to proper condition. Our first step was to get familiar with the building which required multiple meetings on-site, walking and inventorying every single aspect of each building with the design team. Vannoy, as the CMAR, worked hand-in-hand with the design team to find the best construction practice and determine the best practical way to complete each task while being good stewards of the client’s very tight budget. The Asheville High Main Building is the largest single building and scope includes replacing the nearly 100-year-old clay tile roof, re-pointing, cleaning & tucking the entire stone facade of the building, as well as replacing 2/3rds of the steel lintels embedded in the masonry veneer – all while keeping the school open and operational. Similar work is planned for the remaining buildings.


abc-carolinas-merit-award

griffin-award

Gaia Herbs

The new warehouse and manufacturing facility for GAIA Herbs project consisted of a 140,00 sf 30’ clear concrete tilt-wall system with a 15,000 sf single-story office appendage. The main structure included a 20,000 sf clean production room, a future 20,000 sf bottling room, a future 20,000 sf bottling room, a full-service commercial kitchen and the balance used for high-density warehouse racking. This project was a challenge from the beginning trying to manage the Developer’s budget, the Tenant’s expectations, all while keeping the project on a fast track schedule.